Bull Leader ShelfBull Leader Shelf

E-mail :  service@tsaicy.com
Products

Beam storage rack

------------------------------------------

Chinese Name : 横梁式仓储货架
Category : Heavy storage rack
Price :
Description : Item : 97E heavy duty storage shelves Code: BLH006 Description : It has a full range of specifications adaptable to all kinds of storage. It can make full use of space and easily access the goods by forklift. Easy to install and unloaded. Equipped with safety pins, separators , protector legs and other accessories to ensure the safety and reliability. Use various types of forklift or stacker , to fastly achieve the access of the tray . The maximum load up to 5000kg for per unit of cargo space. Advantage : ● Can be extended in accordance with requirements . ● Height can freely to adapted and modified . ● Inventory Management “first in , first out “. ● High flexibility and a variety of fusion storage methods . ● Of high stability, space utility. ● Boltless installation, and easy assemble and dismantle . ● Load capacity up between 1-4 tons for each tier unit. ● Surface treatment: electrostatic spray finish. ● Standard Color: column in blue , beam in orange. Dimensions (mm) : customized Length:1500-2700 Width: 600-1200 Height:1500-8000 Upright: 108*75 Beam: 100*40 Payment method : 30%T/T deposits , the balance is to pay by T/T before shipment. Delivery date :10-20 business days after receiving deposits .
Hot Selling
more>>


undefined


undefined


 


Product name

  97E Heavy Duty Storage Shelves BLH006

Features

 

 

 Material:  Cold-rolled Steel


 Load capacity:  1000-5000kg/layer


 Surface Treatment: spray painting


 Color:  black, white, blue

 

 OEM/ ODM:  Accepted

 

 Feature:  Corrosion Protection ,double-side

Specification

 This shelf with popular design,easy to assemble and dismantle, safe to keep goods.

Different thickness,size,layers,and colors are available for you to choose.

Others

 Minimum order quantity: 10 sets
 Supply ability:5000 pieces per month
 Payment terms: 30% deposit upon signing the contract,the balance will be cleared by T/T before delivery.
 Delivery Terms: Upon factory
 Delivery Time: 10-15 workday upon receipt of the deposit






  1. Q: Are you manufacture or trading company?
    A: We are manufacture. Our factory has been specializing in supermarket shelves, warehouse racks and different,kinds of display stands since 2001.
  2. Q: Where is your factory? Can I visit ?
    A: Our factory is located in Foshan, Guangdong. You are warmly welcome to visit whenever you are available.
  3. Q: What is your delivery time?
    A: In general, within 15 days. It also depends on the order quantity and shelving design.
  4. Q: What is the term of payment?
    A: Payment terms: 30% of deposit upon signing the PI, and balance will be cleared by T/T before delivery.
  5. Q: Are samples available?
    A: Yes, samples are available at any time. We charge some sample cost and will return it during the next order.
  6. Q: How about your quality?
    A:All of the steel are best cold rolled steel (Q235), much firmer and  stronger bearing capacity.                               Manufacturing process : getting rid of the oil 
    → washing → drying  elactriostatic spraying .All products are corrosion-resistant and durable . 
  7. Q: How could I install the racks?
    A: We provide detailed install instruction for every type of shelf. If needed,we can also ask engineers to teach you for free.
  8. Q: Could you produce according to customers’ design?
    A: Sure, we have very rich experience in customizing shelves.There are 3 main excellent designers with 5 years experience in shelf design to give you professional  design.
  9. Q: Do you produce shelf with different kinds of materials?
    A: Yes,our products baby bottle storage rack are mainly made of metal but we also produce accessory shelves or displays with wood,titanium alloy,acrylic,glass,etc.
  10. Q: What are main rack and add on rack?
    A: The difference between these two kinds of racks is upright. Main rack is the start rack with 2 uprights and add on rack is the continue rack with only 1 upright. For example, if there are 15 wall racks against the wall, the structure will be 1 main rack+ 14 add on racks.
  11. Q: What is the manner of packing?
    A: Generally, shelves are flat packed by air bubble film/ film in standard export cartons. Other packing like wooden box are available to clients’ requirement.

      

Ask for more information

Contact us to get a 10% discount! And we will reach you in 24 hours.

Relative Products
more>>
Contact Now
E-mail: service@tsaicy.com

Sales 1

Sales 2

WeChat Subscription